
Add to Cart
Nickel Alloy Copper Precision Mould Parts For Nail Polished Bottle Cap
High Finished Nickel Alloy Copper Mold Core Insert Components for Nail Polished Bottle Cap
Characteristics Of Mold Core Inserts:
A real Mold Core Insert is characterized by an arrangement of different cavities with different geometries. the simulation of filling a single independent cavity as described above is only a part of the simulation to characterize the filling behavior of a typical microstructured Mold Core Insert, because the filling behavior is influenced by the pressure distribution in the remaining layer and the arrangement of cavities with different geometries. A detailed filling simulation of microstructured molds requires much CPU power, is time-consuming, and varies for every design. To obtain general information on the filling behavior during the compression state, a characteristically geometric representation of a typical Mold Core Insert has to be chosen
Specification Of Mold Core Insert:
Shaping Mode | CNC/Milling/+Grinding |
Product Material | High Speed Steel |
Hardness | HRC50-64 |
Tolerance | +/-0.002mm |
Surface Finishing | Polished |
Coating | TiN/TiCN/ALTiN |
Brand Name | Standard |
Delivery time | Stocks Now (Or 7-8 Days) |
MOQ | 1 pcs |
Port of loading | Shenzhen |
Payment | T.T Western Union ,Paypal |
Our Service
1. Professional technical team
2. High precision with 0.002mm
3. Reasonable price
4. Strong production line
5. OEM and ODM Services
FAQ:
Q1: How To Guarantee The Quality Of Industrial Parts?
A: We have been in Plastic mold parts field over fifteen years with full experience. and there are 5 checks in the whole processing, we have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts production
Q2: Can I Get A Sample Before Mass Production?
A: We can provide free sample if we have this in stock, as long as you afford the freight.if no stock, we can produce for you after get sample fee. lead time: 5-7 workdays
Q3: What Is The Lead Time Of The Mass Production?
A: Normally, 7-15 workdays, it depends on the quantity
Q4: What's The Advantage?
A: The competitive prices, fast delivery and high quality. responsible-oriented employees strict tolerance, smooth finish and long-life performance